BENHA PORT-SAID E ZAGAZIG- ABU KEBIR

An important contract awarded at the end of an international tender in which Italferr placed ahead of major international engineering companies.

Italferr was commissioned by ENR - Egyptian National Rail - to develop the design of the signalling systems of Corridor IV of the Egyptian infrastructure network, represented by the two strategic sections Benha-Zagazig-Ismailia-Port Said and Zagazig-Abu Kebir, for a total extension of about 214 km, 21 stations, 1 CTC (Centralised Traffic Control point) in Zagazig and 40 technological buildings.

THE STATIONS AND OBJECT CONTROLLERS (OC) ACTIVATED
Abu Hammad
Shiblanga     
Minyet El Qamh and OC02
Hehya
Al Shabanat, OC06 and Automatic Area Al Shabanat-Abu Hammad
El Kantara
Tell El Kebir and OC07
El Cap and OC14
Ba'alwa and Automatic Area Ba'alwa-Tell El Kebir
Abu Suweir
El Tina, OC15 and Automatic Area El Tina-El Cap
El Raswa
Ras El Esh, OC16, OC17, Automatic Area Ras El Esh-El Tina and Automatic Area Ras El Esh-El Raswa
OC01
Abu Kebir, OC19 and Automatic Area Abu Kebir-Hehya
El Ballah, OC13 and Automatic Area El Ballah-El Kantara