RISHIKESH-KARNAPRAYAG RAILWAY LINE
Italferr was awarded by Indian Railways RVNL the detailed design and Project Management Consultancy (PMC) services of Lots 1 and 8 of the new broad gauge railway line between Rishikesh and Karnaprayag.
The 125.20-km-long route with about 85 percent in tunnels (105.47 km in 17 tunnels) includes 12 stations.
Work began in March 2019 and is currently underway - a very important project for the state of Uttarakhand.
PROJECT DATA
LOT 1
Total length: 12.429 Km |
1 tunnel 10.850 Km long |
1 station: Shivpuri Yard (0.794 Km) |
LOT 8
Total length: 16.269 Km |
2 tunnels 6.430 Km and 7.012 Km long |
2 stations: Golthir Yard (1.122Km) and Gauchar Yard (1.185 Km) |